The post-production area is the pulse, the rhythm, the voice of the new home. There we record the music of all of our musical...
This morning we erected the inner walls of our new kitchen. The walls will make it possible for division of inner compartments: a serving...
Our kitchen plans changed many times. In the beginning, we wanted to build it on the second floor. Frida Sofer, our friend from Rishon...
The kitchen is the heartbeat of the building. All of the meals and events begin and end in the kitchen. The meals connect us,...
A truck on which is written “Buried Garbage Bins” arrives. The goal: To bury two gigantic 3.10 meter high garbage bins in the ground....
During the last months, we’ve been involved with building the third floor which has centered within it, the organization’s entire dissemination system: • The...
Last week we published an interview with our special friend Owen where he explained the production process, the importing and installation of the furniture...
Owen Zhou from Beijing, China. http://www.youtube.com/watch?v=xHY1ZWB6L4M
From 3am until 9am our friends worked on installing toboggan gonflable the huge chillers on the roof. Large cranes arrived, there was a lot...
Remember all the updates from the roof? The remains, demolition and breakage? So as you know the preparation stage is the most important. And...
The kitchen is one of the most prominent and important places in the building – this is where the warmth and pleasant smells come...