Crossing to the Server Room and Installing the Air Conditioning Ducts in the Large Studio

Today (24.9) the first point of light was kindled in the building. Even though everything was covered in dust and plaster, with cables hanging...

  • September 25, 2013

Pouring Concrete on the Roof

On the evening of the Sukkot holiday gigantic pumps arrived at our home. They pumped and spewed concrete on our roof. For months we...

  • September 11, 2013

Running The Water Pipe Lines

Very special friends from the group of Haifa arrived today. Together, they decided to work in the building side by side for a whole...

  • September 2, 2013

Installing a Cooling Unit in the Servers’ Room

Last Friday, 30/8 Amnon Shahar, our dear friend for Beer Sheva group, brought us a cooling unit which is so very necessary for our...

  • September 1, 2013

Preparing the Roof for the Holidays

The holiday season is at our doorstep and with it comes a lot of preparation. The festive environment bouncy castle is already felt and...

  • August 25, 2013

The Preparation of the Infrastructure for the Air Conditioning Unit in the Servers’ Room

Today, 22.8, we finished giochi gonfiabili all of the preparations for the installation of our air conditioning system for the servers’ room! Thank you...

  • August 23, 2013

That’s it! We Have Been Digging…

Today, like every day, our heroic friends from the groups of Zichron Yaakov, Rechovot, Pitchat Nitzana, and Petach Tikva, all together 36 friends have...

  • August 18, 2013

The Building of the Studio for Dr. Laitman’s Broadcasting Begins!

Today, 15.8.13 we started building the studio where Dr. Laitman will be broadcasting. It’s going to be a small and intimate studio of approximately...

  • August 14, 2013

The Hot Season

As we all know in our small country, it’s impossible to survive in the summer without air-conditioning, therefore our friends have gathered to prepare...

  • August 14, 2013

Making Space for the Kitchen

There is not a home without a kitchen! The kitchen is a very important function in every home; therefore it’s the next stage in...

  • August 14, 2013

Pouring Concrete!

We have reached the second and final stage of the studio floor building; the stage of pouring the concrete. Many workers have inflatable park...

  • August 14, 2013

Platsiv Time

The emphasis in our building at the moment is work on the studios which are on the third floor. Building the floor in the...